SR Smith Econo-line 1 Meter Stand with Frontier III Diving Board Installation
SR SMITH
1 METER ECONOLINE DIVING STANDS
ASSEMBLY AND INSTALLATION INSTRUCTIONS
INTRODUCTION
The 1 METER DECK LEVEL DIVING STAND is designed for use on competitive or municipal pools. It provides a safe, unique look with a minimal amount of deck space. Proper and complete assembly, use, and maintenance are essential for proper operation and to reduce the risk of accident or injury.
Check entire box and inside all packing materials for parts. Before beginning assembly, read the instructions and identify parts using the figures and parts listed in this document. It is critical that all parts be carefully inspected by the installer prior to installation to ensure that no damage occurred in transit and that a damaged part is not used. Proper installation cannot be overstressed, as an improper installation voids S.R. Smith’s warranty and may affect the safety of the user. THIS STAND IS PRIMED ONLY. WE STRONGLY RECOMMEND A HIGH QUALITY ACRYLIC URETHANE ENAMEL FOR A DURABLE FINISH.
MODEL NO. | ANSI/APSP/ICC -1 2014 POOL TYPE | BOARD | FULCRUM | “A” | “H” | MINIMUM OVERHANG, (L1) |
---|---|---|---|---|---|---|
E-CAT-1M-100 | VII | 12" | 62" | 65 1/4" | H = 34" – WATER LEVEL | 36" |
E-CAT-1M-101 | VIII | 14" | 74" | 83 1/4" | H = 34" – WATER LEVEL | 48" |
ITEM NO. | QTY. | PART NO. | DESCRIPTION |
---|---|---|---|
1 | 1 | E-CAT-1M-100A | E-CAT-1M-100 STAND, LESS HARDWARE |
1 | 1 | E-CAT-1M-101A | E-CAT-1M-101 STAND, LESS HARDWARE |
2 | 1 | 6-621 | PLASTIC NON-SKID, ADHESIVE BACKED |
3 | 1 | 25-101 | FULCRUM ASSY |
4 | 2 | 8-606 | END CAP, PLASTIC |
5 | 1 | FC-100A | FULCRUM COVER, 20" |
6 | 10 | 5-145 | 3/8" FLAT WASHER, S.S. |
7 | 10 | 5-151 | 3/8" LOCK WASHER, S.S. |
8 | 10 | 5-139 | 3/8" UNC, HEX NUT, S.S. |
9 | 2 | 08-501 | RUBBER MOUNTING PAD, 18" |
10 | 4 | 25-102 | BRACKET ASSY, HANDRAIL |
11 | 8 | 05-32-133 | 3/8"-16 HEX BOLT, S.S. |
12 | 1 | 25-104 | ECAT 100 HANDRAILS |
12 | 1 | 25-106 | ECAT 101 HANDRAILS |
13 | 4 | 5-170 | 3/8"-16 X 2-1/2" CRADLE HEAD BOLT |
14 | 4 | 5-151 | 3/8" LOCK WASHER, SPLIT, SS |
15 | 4 | 5-139 | 3/8" UNC, HEX NUT, SS |
16 | 1 | 01-820 | TOP MOUNT PLATE, 18" BOARD |
17 | 2 | 05-31-171 | 1/2" X 3-1/2" CARRIAGE BOLT |
18 | 2 | 05-14-155 | 1/2" LOCK WASHER, SPLIT C/S ZINC PLATED |
19 | 2 | 05-33-116 | 1/2" HEX NUT C/S ZINC PLATED |
20 | 2 | 05-618 | NUT CAP, 1/2", WHITE PLASTIC |
21 | 1 | - | DIVING BOARD (ORDERED SEPARATELY) |
ASSEMBLY INSTRUCTIONS
- Carefully read pages 7 through 12 in this booklet, which contains the applicable articles of the ANSI/APSP/ICC-1 2014 STANDARD FOR PUBLIC SWIMMING POOLS. COMPLY WITH LOCAL GOVERNMENT REGULATIONS FOR PUBLIC SWIMMING POOLS IF THEY EXCEED THE ANSI/APSP/ICC-1 2014 STANDARD.
- Refer to TABLE 1 for correct placement of the E-CAT DIVING STAND, which is dependent on the type of pool and the length of diving board that is used. Begin by setting the E-CAT STAND (item 1) in concrete per local building codes. Excavate area required for concrete base. See FIGURES 1 AND 2 for minimum dimensions of concrete surrounding the stand.
- Ground the stand using provided grounding anchor, located on lower stand tube, per local electrical building codes.
- Check stand for height and check for level in two directions, pour concrete. (Reinforcing rods (rebar) are customer supplied, use #3 X 16” long minimum) FILL PIPE WITH CONCRETE THROUGH HOLE IN TRAY.
- Paint the diving stand using a high quality acrylic urethane enamel for a durable finish. Do not begin assembly of the E-CAT STAND until mounting concrete is fully cured.
- Place Plastic End Caps (item 4) over the ends of Fulcrum Assembly (item 3). Slide Fulcrum Cover (item 5) over fulcrum assembly. Place fulcrum assembly threaded studs through appropriate slots in E-CAT Stand (item 1). To ensure proper fulcrum positioning see TABLE 1. Place 3/8” Flat Washer (item 6) over the fulcrum assembly treaded studs. Place 3/8” Lock Washer (item 7) over the fulcrum assembly threaded studs. Place 3/8” Hex Nut (item 8)over the fulcrum assembly threaded studs. After appropriate fulcrum position has been determined and set, tighten hex nuts. See FIG. 3.
- After Diving Board (item 21) has been selected, place Rubber Mounting Pad (item 9) onto angle plate located on the top, heel end, of the E-CAT stand. Align holes of rubber mounting pad with holes on E-CAT stand. Place diving board on top of rubber mounting pad and align holes of each. Place another rubber mounting pad on top of the diving board. Place Top Mount Plate (item 16)over rubber mounting pad and align holes to diving board. Place two (2) ½” CARRIAGE BOLTS (item 17) through holes in top mounting plate, rubber mounting pad, diving board, lower mounting pad and E-CAT stand. Place two (2) 1/2" Lock Washers (item 18) and two (2) ½” Hex Nuts (item 19) onto carriage bolts. Tighten hex nuts between 20 and 25 ft-lbs. for fiberglass boards, and between 35 and 40 ft-lbs. for aluminum boards. DO NOT OVER TIGHTEN! Place ½” Nut Caps (item 20) over hex nuts two (2) places. See FIG. 4.
- Locate Handrail Bracket Assembly (item 10). Handrail brackets are installed in four (4) places on the E-CAT Stand in the same way. Align slots in E-CAT Stand with slots in handrail bracket and place 3/8” Hex Bolt (item 11) two (2) places. Place 3/8” Flat Washer (item 6), 3/8” Lock Washer (item 7) and 3/8” Hex Nut (item 8) onto hex bolts and tighten as shown below, FIGURE 5. Note: Handrails and Handrail Brackets are ordered separately.
- Locate Handrail (item 21), slide over installed handrail bracket assembly and align holes. Place 3/8” Cradle Head Bolt (item 7) through handrail and handrail bracket. Place 3/8” Lock Washer (item 8) and 3/8” Hex Nut (item 9) onto cradle head bolt and tighten. DO NOT OVER TIGHTEN! See FIG. 6.